Published Date: April 22, 2026
Validated: Yes
Audience: Everyone
Products and Versions Covered:
- Jama Connect® 9.17.x, 9.22.x, 9.28.x, and later
- Cloud/CVC
- Self-hosted
Summary
Jama Connect® is designed to meet enterprise-scale requirements management needs, supporting projects containing up to 10 million items.
The System Health Report includes configurable thresholds that help administrators monitor project size and system performance. These thresholds are reporting indicators only and do not define project capacity or impose limits on the number of items a project can contain.
Organizations can adjust these reporting thresholds to align with their project sizes and monitoring needs.
For more information about enterprise scalability, see Jama Connect Enterprise Scalability & Performance.
Resolution
Understanding the System Health Report Threshold
The System Health Report in Jama Connect administration view is a default reporting threshold to monitor large projects. You may update this threshold according to your specific system performance and risk tolerance needs. We recommend maintaining a threshold at or below 10 million items.
Exceeding the threshold your team sets does not prevent a project from growing, restrict functionality, or automatically indicate a performance problem. Jama Connect supports projects with up to 10 million items. Actual performance depends on several factors beyond item count, including:
- Project structure and complexity
- Views, filters, and list configurations
- Relationships between items
- Baseline creation and comparison
- Reporting and export activity
- Overall system configuration and usage patterns
The System Health report should therefore be viewed as a configurable monitoring setting rather than a measure of platform capacity.
Adjusting the System Health Report Threshold
Organization Administrators can adjust the default reporting threshold to better reflect their organization's project sizes and monitoring requirements.
To update the threshold:
- Navigate to ADMIN > Organization.
- Select System Health Report.
- In the Reports section, locate Projects.
- Select Edit Threshold and update the value to align with your organization's monitoring needs.
Thresholds can also be configured for Reviews, Reports, and Test Plans.
Monitoring Performance in Large Projects
For large and complex projects, we recommend monitoring actual system behavior rather than relying on item count alone.
Performance indicators worth investigating include:
- Views and lists consistently taking longer than expected to load.
- Baseline creation or comparison taking longer than expected.
- Reports or exports experiencing delays or timeouts.
- Relationship-heavy operations taking longer than expected.
If you experience persistent performance concerns, evaluate the underlying usage patterns and configuration rather than assuming the project's item count is the cause.
Additional Resources
- View a system health report
- Understanding the System Health Report
- Success Programs
- Success Catalog
- Datasheets
- Request a Solution Offering or Training from the Success Catalog
Feedback:
We welcome your input! Please sign in to leave any comments, suggestions, or ideas for improvement below.
Comments
0 comments
Please sign in to leave a comment.