-
List of key settings customers should verify after a future upgrade
-
Consult the Upgrading Traditional Jama Connect guide prior to performing the upgrade
-
Review Jama 8 Installation and Upgrade Troubleshooting Tips for a thorough walk-through of steps to take prior to submitting a Support ticket
-
After an upgrade, a full reindex should always be performed (see Perform a full re-Index from the Root menu above)
-
Validate if the reindex was successful in the contour.log (see example below)
-
In case a reindex is not completed successfully some odd behaviors may occur, such as the list of users or the list of scheduled jobs showing empty in the GUI
-
Ensure that log tracking is enabled for your Jama Connect instance
-
Logging Levels and Tomcat Restart – The logging tool is instrumental in diagnosing issues with your Jama instance
Adjusting the Size of Log Files
Troubleshooting an outage on Jama 8.0 and up
Example Reindex Completion Log:
Comments
0 comments
Please sign in to leave a comment.